Customization: | Available |
---|---|
After-sales Service: | Repair Within One Year |
Certification: | CE, ISO, MSDS |
Still deciding? Get samples of US$ 0.36/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ITEM
|
MEASUREMENT
|
TEST METHOD
|
Tensile Strength
|
0.7kgf/cm2
|
JIS K 6301 500MM/MIN
|
Water resistance
|
No deterioration ,No fat separation,Water absorption>0.028
|
20ºC water, 168 Hr
|
Heat resistance
|
no hanging,No fat separation, No deterioration
|
5mm*5mm*100mm on Vertical steel plate,110ºC 168Hr
|
Holding power
|
slide is 0.5mm
|
2mm*50mm*50mm on Vertical steel plate,100ºC 168Hr
|
Cold resistence
|
no craking, no slide
|
5mm*5mm*100mm on Vertical steel plate,-30ºC 24Hr
|
Offensive smell
|
on offensive smell
|
10g in 1 liter glass tubes, 24Hr
|
Note:
Butyl Sealant Main Application: Butyl rubber tape is suitable for the shock-absorbing paste of windshield, door waterproof film,decorative parts,car lamp,bus body and frame,as well as the sealing of body seam and flange plate
Product features
The double sealing rubber strip has very good stickiness and solvent resistance. It can be used as the first layer of sealing for the hollow glass, and can be used along with any series of sealing adhesion. There will be no phenomenon of "yellow water".
0.5mm thick*4mm wide*25m/roll 400 rolls/carton
It can also be customized according to the customer's demand.
Construction method
Construction method of the new engineering of steel Structure roofing
Select the proper specification according to the shape of the metal plate or the gap and joint of the bonded pat and in line with the requirement of the engineering design
Clean the bonded part of the metal plate
Uncover the double-face rubber tape slowly from one end of the metal plate,and stick the sealing tape to the lap joint of the lower layer of metal plate along the straight line of the joint,then ,press the tape gently with your hand,so as to make it stick fast to the metal plate
Tear the release paper on the butyl sealing tape ,and press the metal plate on the upper layer of the interface into the bonded and sealed tightly
Fix and tight the screw ,and make the upper and lower bonding surface of the tape bonded tightly
Stipulations of construction
The stipulation apply to the sealing and waterproofing work of the roofing and metal plate of civil engineering structure that uses the rubber tape for the bonding the waterproof roll,metal contour plate,PC plate and other supporting materials
To design and use the rubber tape ,the relevant regulations and the enterprise standard of the company shall be followed
1.Q : Are you a factory or trading company ?
A: We are a factory , can offer best quality product ,reasonable price and supply the stable quality adhesive tape for you.
2.Q: Can you do OEM?
A: Yes, we can do OEM products. Send us your requirement details now.
3.Q:How can I get some samples?
A: We are honored to offer you free samples. New clients are expected to pay for the courier cost, the samples are free for you, this charge will be deducted from the payment for formal order.
4.Q:What about the payment?
A:30% deposit in advance, 70% balance againstcopy of B/L, by T/T, Cash or 100% LC at sight.
5.Q:What's our normal Trade Terms?
A:EXW, FOB, CIF, CNF, DDU, L/C ect.
6.Q:How long is the lead time?
A:Normally within 5-25 days after deposit received.
8.Q:How to control your quality?
A:All of our products can meet the UL,VW-1,MSHA,BS 2576 certificates.We have complete quality guarantee system: IQC FAS &Self checking for
each producing progress →OQC. And as below:
1). Before production: sending pre-production samples for checking.
2). During production: sending mass production samples for checking again.
3). Before shipment: customers' or the third parties' visit to our factory to check the quality directly or any inspection is welcome!
4). After shipment: if there is any problem of our goods due to our mistake,we will surely be responsible for it.
9.Q:How to guarantee punctual shipment for my order?
A:We give priority to export orders and keep updating progress from production to delivery.
10.Q:If we don't have shipping forwarder in China, would you do this for us?
A:Yes, we can offer you best shipping line to ensure you can get the goods timely at best price
11.Q:How can we get detailed price list?
A:Please offer us detailed information of the product such as Size(length,width,thickness),color,specific packaging requirements and purchasing quantity.